Art. 53 - Conditions of Transit : (See Circular Updates, Cir. No. 1/1998)
The Maximum draught for loaded vessels
is according to Table II (must not exceed the Tropical Load Line). For vessels
without tropical load Line indicated in the load Line Certificate, the maximum
draught allowed will be the summer load Line.
Vessels allowed to transit with a draught of over 50 feet up to 56 feet must,
for the first passage, effectuate successful sea trial before entering the Canal
either at Suez or Port Said Roads. Sister-ships are not to get benefit of authorization
granted to a particular ship of the group.
For safety measures, LPG, LNG in ballast or loaded, and loaded dangerous chemical
in bulk are included in the "Tankers" group and they are placed ahead of the
loaded tankers.